
Choose from: Tabular display of the results, display of a stage plan or selectivity diagram of a transformer station
Select how results are displayed: Grid node perspective ("A short-circuit at which nodes would not be compliantly switched off?”) or fuse/protection device ("Which fuse/protection device has non-compliant switch-off times in certain cases?”)
Display of the selectivity diagram and short circuit details
Selectivity diagram to view the disconnection selectivity of staged fuses or protection devices
Visual display on the grid topology
Stress test result without grid reinforcement
Stress test result with grid reinforcement
Grid reinforcement details shown in the list of grid elements
Estimate of the total cost of the grid reinforcement measures
Grid reinforcement is displayed directly in the grid model